Refine your search:     
Report No.
 - 
Search Results: Records 1-8 displayed on this page of 8
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Measures of closing report of outside waste storage pits; Separate Volume Part I; Photographs sbout improvement step of outside waste storage pits

Yoshida, Michihiro; Suzuki, Satoshi*; Sukegawa, Yasuhiro*; Miyo, Hiroaki

JNC TN8440 2000-021, 180 Pages, 2000/10

JNC-TN8440-2000-021.pdf:42.37MB

At outside waste storage pits, containers for storage of wastes corroded and were flooded, and it was confirmed on August 26, 1997. Confirmation of contamination of the pits outskirts, installation of sheets to prevent rainwater from flowing into the pits, drawing stay water were executed, promptly. Design and authorization works of the work house and waste treatment devices to take out wastes of the pits were executed too. After construction of the work house, taking out wastes of the pits started, and finished on April 10, 1998. Investigations of the inflow point of rainwater and leak of stay water were executed next. The results were reported to Science and Thechnology Agency (STA), adjoining authorities on December 21, 1998. After decontamination of the pits inner walls to background level of the radioactivity which included general concrete, control area was removed, and the pits were closed by concrete. Measures of closing of the pits were prepared from the middle of August, 1999, and dismantlement of unnecessaly instruments started. Decontamination of the pits started fiom the beginning of September, 1999. The above works finished on June 30, 2000. After decontamination of the pits, STA, adjoining authorities confirmed the circumstances. Work pouring concrete into the pits was executed three times (three levels), and finished on August 31, 2000. In addition to above, the amount of concrete poured into the pits was about 1,200 m$$^{3}$$. This report compiled the photographs of the works from confirmation of stay water at August, 1997 by finish of measures of closing of the pits at September, 2000.

JAEA Reports

None

Sumiyama, Morio*

PNC TJ1451 98-001, 247 Pages, 1998/02

PNC-TJ1451-98-001.pdf:114.43MB

None

JAEA Reports

None

; Yasu, Takami; ;

PNC TN8410 97-107, 53 Pages, 1997/05

PNC-TN8410-97-107.pdf:1.29MB

None

JAEA Reports

None

PNC TJ1150 96-001, 192 Pages, 1996/02

PNC-TJ1150-96-001.pdf:7.28MB

None

Journal Articles

Determination of impurity elements in graphite materials by closed vessel acid leaching/ICP-AES

Watanabe, Kazuo; ;

Bunseki Kagaku, 44(1), p.19 - 23, 1995/00

no abstracts in English

JAEA Reports

None

; Nakano, Tomoyuki; Miyazaki, Hitoshi;

PNC TN9420 94-015, 80 Pages, 1994/07

PNC-TN9420-94-015.pdf:2.92MB

None

JAEA Reports

Study on behavior of localized corrosion of carbon steel overpack

Matsuda, Fumio*; Wada, Ryutaro*; Fujiwara, Kazuo*

PNC TJ1058 92-001, 270 Pages, 1992/03

PNC-TJ1058-92-001.pdf:43.06MB

no abstracts in English

JAEA Reports

High radioactive $$alpha$$-$$gamma$$ solid Waste treatment facilities Conceptual design study

*; Seki, Sadao*; *

PNC TJ9409 91-001, 164 Pages, 1991/02

PNC-TJ9409-91-001.pdf:4.41MB

This report describes the result of conceptual design study concerned with "High Radioactive $$alpha$$-$$gamma$$ Solid Waste Treatment Facilities, "which will be planed for the purpose of volume reduction and stabilization of High Radioactive $$alpha$$-$$gamma$$ solid wastes generated and stocked in the O-arai Engineering Center of PNC. In this conceptual design study the basic process of the facilities, which are sufficient to treat each waste and develop technologies, are clarified. This report consist with: (1)Clarification of waste to be treated. (2)Study on the treatment technology and process. (3)Conceptual design of facilities and equipment. (4)Estimation of construction cost and schedule.

8 (Records 1-8 displayed on this page)
  • 1